12. July 2023

Line Design Simulation

Manufacturers in the consumer goods industry face the challenge of remaining profitable despite increasing product variants and higher demands on production lines. Ensuring a high OEE, even with different product variants, is a key component.

Through an in-depth understanding of the complex interrelationships within production lines and the use of special simulation methods, we support companies both in the operating phase of existing lines and the start-up phase of new lines. 

The analysis of existing production lines can identify potential for increasing OEE and minimizing unplanned downtime through clever adjustments to operating parameters. In the planning and start-up phase of new lines, time-consuming and costly trial-and-error procedures can be reduced by using these methods, thus shortening the time to production start-up.

Take advantage of higher production output and shortened time-to-market!

Liniensimulation-3 Line Design Simulation

Contact

Seth-Schmitz-2 Line Design Simulation
Dr. Seth Schmitz
Managing Director
Telefon: +49 241 80 27387
E-Mail: s.schmitz@gpmc-aachen.de
Tim-Janke-3 Line Design Simulation
Tim Janke, M.Sc. RWTH
Head of Business and Software Development
Telefon: +49 175 4300711
E-Mail: t.janke@gpmc-aachen.de